Harvard University John A. Paulson School of Engineering and Applied Sciences

Allston, MA

Leggat McCall Properties was hired as the project manager for construction of Harvard’s new science and engineering complex in Allston in 2016. The project includes ground-up construction of a 6-story academic research lab with 2 additional floors below grade. All floors are connected by an 8-story atrium that extends to the lowest below-grade floor.

The new building will contain four tiered classrooms, two 60-person flat classrooms, seminar rooms, conference rooms, a cryo electron microscope imaging suite, and various core labs. Individual research labs are planned for Robotics, Computer Science/Electrical Engineering, BioEngineering, Materials Research/Engineering, and Mechanics.

The SEC is targeting LEED Gold.

BACK TO PROJECTS

Project Highlights

Facts
  • Size: 550,800 SF
  • Property Type: Academic Research Labs and Classrooms
  • Year started/completed: 2016/Ongoing
Team
  • Owner/Client: Harvard University
  • Architect: Behnisch Architekten
  • General Contractor: Turner Construction
Services Rendered:
  • Project Management